You the position in nowadays:Home page > Products center > 300,000DWT FPSO

300,000DWT FPSO

    

    “HAIYANGSHIYOU 117” FPSO was constructed by CSSC SWS. This FPSO has the deadweight of 30,000t, and it is also one of the biggest FPSOs with the largest process capacity up to now in the word.

Main Parameters
Size (Length x Breadth x Depth x Draft)
m
323.0 x63.0x 32.5x 20.0
Storage Capacity
bbls
2,000,000
Scope of Work
 
EPC Contract
Duration of Project
 
2005-2007
Class
 
DNV
Owner/Client
 
ConocoPhillips/CNOOC
Designer
 
MARIC
Milestones
Kick-off meeting
 
Mar.1, 2005
Steel cutting
 
Nov.8, 2005
Keel Laying
 
Feb.22, 2006
Launching
 
Dec.8, 2006
Delivery
 
May.1, 2007

Copyright and privacy | The familiar problem answer | Website map | Contact Us
All rights reserved, Copyright, Offshore Department of China State Shipbuilding Corporation
Address:16th Floor,Marine Tower,No.1 Pu Dong Avenue,Shanghai,China Postcode:200120
All Rights Reseved Tel:+8621 58790635 58790630 58790633 Fax: +8621 58790632
Technical support by China Shipbuilding IT Co., Ltd.
Information support by CHINA SHIP NEWS
E-mail: cssc@cssc.net.cn
Tel: +86-10-68038833 Fax: +86-10-68034592