You the position in nowadays: Home page > Capacity > ‘HAIYANG SHIYOU 117’FPSO

‘HAIYANG SHIYOU 117’FPSO

    

   This FPSO hull was an EPC contract from ConocoPhillips/CNOOC, executed in CSSC SWS shipyard during Mar. 2005~Apr.2007. It’s one of the largest FPSOs in the world up to now.

1. Main technical Parameters


 

2. GA plans


 

3. Milestones

Contract Signed: 01-03-2005

Steel Cutting: 08-11-2005

Keel Lay/Erection: 22-02-2006

Launching: 08-12-2006

Hull Delivery: 01-05-2007

4. Pictures


Keel Lay/Erection (22-02-2006)

Erection in dry dock (24-10-2006)

Launching (08-12-2006)

Naming (30-04-2007)

‘First Oil’ (May, 2009)

 

Copyright and privacy | The familiar problem answer | Website map | Contact Us
All rights reserved, Copyright, Offshore Department of China State Shipbuilding Corporation
Address:16th Floor,Marine Tower,No.1 Pu Dong Avenue,Shanghai,China Postcode:200120
All Rights Reseved Tel:+8621 58790635 58790630 58790633 Fax: +8621 58790632
Technical support by China Shipbuilding IT Co., Ltd.
Information support by CHINA SHIP NEWS
E-mail: cssc@cssc.net.cn
Tel: +86-10-68038833 Fax: +86-10-68034592